GDOT programs $46M for the Highlands/Benton widening

GDOT programmed $45.97 million for a 2029 widening of the 2.1-mile connector between SR 17 and SR 30.

AI editorial concept showing a torn-paper split view of a narrow tree-lined residential road beside a broad landscaped multilane boulevard.AI IMAGE — NOT AN ACTUAL PHOTO OR PROJECT RENDERING

Georgia DOT moved the Highlands Boulevard and Benton Boulevard connector into its Construction Work Program, with $45.97 million programmed for construction in 2029. The plan would widen 2.1 miles from two lanes to four, add a raised median and widen the St. Augustine Creek bridge between Savannah and Port Wentworth. Right-of-way work is funded for 2026; construction remains at zero percent.

Why it matters

The connector links I-95’s Jimmy DeLoach Parkway interchange with Port Wentworth and a major freight route to the port.

What to watch

Watch for right-of-way acquisition during 2026 and a construction notice before the programmed 2029 funding year.

JurisdictionCity of Port Wentworth
Scale2.1 miles · $45.97 million
TimelineConstruction funding in 2029
WhoGeorgia Department of Transportation
Sources and documents6 sources

See an error, or have an update on this project? Tell Urban Savannah.

Connected coverage

Follow the thread

All updates →

Explore the projects, places, developers and public systems connected to this story. Each card explains the link.

Talmadge BridgeChatham County

Both involveGeorgia Department of Transportation

Program

Talmadge Bridge program reaches 4.39%

Georgia DOT’s current project dashboard now lists the overall Talmadge Memorial Bridge maintenance project at 4.39 percent complete. That is a later official status for the same project and pointer already verified on September 30; GDOT’s project page still separates the overall program from the cable-replacement work package, whose field work was expected in the fourth quarter of 2026.

Chatham County Sep 30, 2026
Project: Talmadge Memorial Bridge Cable Replacement
Brick exterior of Savannah Mall with entrance signage and a Texas Roadhouse storefront.Southside

Both involveCity of Savannah

Milestone

Savannah maps a mixed-use future for the closed mall

A new city-backed study would replace the Southside mall’s superblocks and parking fields with a walkable mix of homes, shops and public space.

Southside Sep 28, 2026
Project: Savannah Mall redevelopment