GDOT programs $46M for the Highlands/Benton widening

GDOT programmed $45.97 million for a 2029 widening of the 2.1-mile connector between SR 17 and SR 30.

AI editorial concept showing a torn-paper split view of a narrow tree-lined residential road beside a broad landscaped multilane boulevard.AI IMAGE — NOT AN ACTUAL PHOTO OR PROJECT RENDERING

Georgia DOT moved the Highlands Boulevard and Benton Boulevard connector into its Construction Work Program, with $45.97 million programmed for construction in 2029. The plan would widen 2.1 miles from two lanes to four, add a raised median and widen the St. Augustine Creek bridge between Savannah and Port Wentworth. Right-of-way work is funded for 2026; construction remains at zero percent.

Why it matters

The connector links I-95’s Jimmy DeLoach Parkway interchange with Port Wentworth and a major freight route to the port.

What to watch

Watch for right-of-way acquisition during 2026 and a construction notice before the programmed 2029 funding year.

JurisdictionCity of Port Wentworth
Scale2.1 miles · $45.97 million
TimelineConstruction funding in 2029
WhoGeorgia Department of Transportation
Sources and documents6 sources

See an error, or have an update on this project? Tell Urban Savannah.

Connected coverage

Follow the thread

All updates →

Explore the projects, places, developers and public systems connected to this story. Each card explains the link.